Hawaiian Electric’s three stages of RFPs for renewable dispatchable generation for Oahu, Maui, and Hawaii Island result in Power Purchase Agreements (“PPAs”) that the Commission reviews. PPAs represent an agreement for Hawaiian Electric to purchase energy from a power plant that a developer builds and operates over a contract term, typically 20 to 30 years.
The following tables provide a list of the resources procured through the RFPs described above, including relevant dockets and developer websites for more information on each resource. Prior to contract submission, Hawaiian Electric and the developer engage in “PPA Negotiations” to develop a contract. Once a contract is submitted to the Commission, it is “Under PUC Review” until approved by the Commission, “PPA Approved” after the Commission’s approval and during construction, and “In Service” once online and providing energy.
Projects that have withdrawn from consideration are not included. Sizes are presented in megawatts (“MW”) for capacity specifications, such as the size of solar panels, and in megawatt-hours (“MWh”) for energy specifications, such as the size of batteries. A project that is 10 MW in capacity could provide 50 MWh in energy if dispatched at full capacity for five hours, for example. A typical household in Hawaii uses approximately 537 kilowatt-hours (“kWh”; 1,000 kWh equals 1 MWh) per month.
Note that this is not a comprehensive list of all renewable resources by island, rather a list of resources procured and either completed or in the pipeline since 2017 through Hawaiian Electric’s competitive bidding process in Docket No. 2017-0352. See Hawaii State Energy Office’s Hawaii Statewide Energy Projects Directory and Hawaiian Electric’s Sustainability Reports for additional directories of renewable energy projects in the State.
Oahu
Stage | Project Name | Developer | Technology | Size | Current Status | Docket |
---|---|---|---|---|---|---|
Stage 1 | AES West Oahu | AES | Solar + Storage | 12.5 MW / 50 MWh | In Service | 2019-0050 |
Stage 1 | Hoohana Solar | Hanwha Energy USA Holdings Corp (174 Power Global) | Solar + Storage | 52 MW / 208 MWh | PPA Approved | 2018-0431 |
Stage 1 | Mililani I Solar | Clearway Energy Group | Solar + Storage | 39 MW / 156 MWh | In Service | 2018-0434 |
Stage 1 | Waiawa Solar Power | AES | Solar + Storage | 36 MW / 144 MWh | In Service | 2018-0435 |
Stage 2 | Kapolei Energy Storage | Plus Power LLC | Storage | 185 MW / 565 MWh | In Service | 2020-0136 |
Stage 2 | AES Mountain View Solar | AES | Solar + Storage | 7 MW / 35 MWh | PPA Approved | 2020-0139 |
Stage 2 | Waiawa Phase 2 Solar | AES | Solar + Storage | 30 MW / 240 MWh | PPA Approved | 2020-0137 |
Stage 2 | Kupono Solar | Kupono Solar Development Company, LLC | Solar + Storage | 42 MW / 168 MWh | PPA Approved | 2022-0007 |
Stage 3 | Puuloa Energy | Ameresco, Inc. | Internal Combustion Engine (Biodiesel) | 99 MW | PPA Negotiations | TBD |
Stage 3 | Puuloa Solar | Ameresco, Inc. | Solar + Storage | 6 MW / 30 MWh | PPA Negotiations | TBD |
Stage 3 | Base Proposal | Kalaeloa Partners, L.P. | Combustion Turbine (Biodiesel) | 208 MW | PPA Negotiations | TBD |
Stage 3 | Waiau Repower | Hawaiian Electric Company, Inc. | Combustion Turbine (Biodiesel) | 253 MW | PPA Negotiations | TBD |
Stage 3 | Mahi Solar and Storage | Longroad Development Company, LLC | Solar + Storage | 120 MW / 480 MWh | PPA Negotiations | TBD |
Stage 3 | Makana La | Clearway Energy Group, LLC | Solar + Storage | 80 MW / 480 MWh | PPA Negotiations | TBD |
Stage 3 | Par Hawaii Renewable Combined Heat & Power | Par Hawaii Refining, LLC | Combustion Turbine (Biodiesel) | 33.9 MW | PPA Negotiations | TBD |
Stage | Project Name | Developer | Technology | Size | Current Status | Docket |
---|---|---|---|---|---|---|
Stage 1 | AES Kuihelani | AES | Solar + Storage | 60 MW / 240 MWh | In Service | 2018-0436 |
Stage 2 | Waena Energy Storage | Hawaiian Electric Company | Storage | 40 MW / 160 MWh | PPA Approved | 2020-0132 |
Stage 3 | Kuihelani Phase 2 Solar | AES | Solar + Storage | 40 MW / 160 MWh | PPA Negotiations | TBD |
Stage 3 | Puu Hao Solar | AES | Solar + Storage | 20 MW / 80 MWh | PPA Negotiations | TBD |
Stage 3 | Kaheawa Wind 1 | Terraform US | Wind | 30 MW | PPA Negotiations | TBD |
Stage 3 | Pulehu Solar & Storage | Longroad Energy Holdings, LLC | Solar + Storage | 20 MW / 80 MWh | PPA Negotiations | TBD |
Stage 3 | Ukiu Energy | Ameresco, Inc. | Internal Combustion (biofuel) | 40 MW | PPA Negotiations | TBD |
Stage | Project Name | Developer | Technology | Size | Current Status | Docket |
---|---|---|---|---|---|---|
Stage 1 | AES Waikoloa | AES | Solar + Storage | 30 MW / 120 MWh | In Service | 2018-0430 |
Stage 1 | Hale Kuawehi | Innergex Renewable Energy Inc. | Solar + Storage | 30 MW / 120 MWh | PPA Approved | 2018-0432 |
Stage 2 | Keahole Energy Storage | Hawaiian Electric Company | Storage | 12 MW / 12 MWh | Under PUC Review | 2020-0127 |
Stage 3 | Keamuku Solar | AES | Solar + Storage | 86 MW / 344 MWh | PPA Negotiations | TBD |
Stage 3 | Puako Solar | Clearway Energy Group, LLC | Solar + Storage | 60 MW / 240 MWh | PPA Negotiations | TBD |
Stage 3 | Kaiwiki Solar | Clearway Energy Group, LLC | Solar + Storage | 55 MW / 220 MWh | PPA Negotiations | TBD |
Stage 3 | Hamakua Firm Renewable Energy | Pacific Current LLC | Combustion Turbine (Biodiesel) + Storage | 60 MW + 7.5 MW / 30 MWh storage | PPA Negotiations | TBD |
MORE INFORMATION
To see more and view all filed documents in the docket, see: Docket No. 2017-0352
See related webpages:
- Renewable Energy Procurement (RFP Docket No. 2017-0352) – Homepage
- Renewable Energy Procurement (RFP Docket No. 2017-0352) – Procurement Process
- Renewable Energy Procurement (RFP Docket No. 2017-0352) – Stage 3 RFPs & Interconnection Dispute Resolution Process
- Renewable Energy Procurement (RFP Docket No. 2017-0352) – Key Orders and Filings
Updated 6/2024